Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 57 results ...

Abdelkhalek, S I (2022) Managing the inspection process of concrete bridge decks, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

Aniftos, S C (1996) International standards: United States construction industry competitiveness, Unpublished PhD Thesis, , Polytechnic University.

Aoieong, R T (2004) Capturing quality costs of construction processes using the construction process cost model (CPCM), Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Aoude, H S (1996) Computerized construction delay management system, Unpublished PhD Thesis, , Polytechnic University (New York).

Aslani, P (2007) Dynamic resource -constrained scheduling, Unpublished PhD Thesis, , Polytechnic University.

Au, C Y M (2013) An optimal contract strategy in managing extension of time provisions in building contracts, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Bao, Q (2003) Effective energy management during a building's life cycle, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Bates, A J (2008) The owner's role in project success, Unpublished PhD Thesis, , Polytechnic University.

Chan, H L J (2011) Developing a fuzzy risk assessment model for target cost and guaranteed maximum price contracts in the construction industry of Hong Kong, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

Chan, K C G (2012) The use of virtual reality for visualizing construction safety management process, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Chan, K Y (2012) Optimizing construction planning and scheduling by virtual prototyping enabled resource analysis, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Chan, P L (2004) Critical success factors for delivering healthcare projects in Hong Kong, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

Chan, T S A (2005) The impact of subordinates' professionalism on leadership effectiveness in the construction industry, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Chan, W T P (2009) Construction industry development and government policy, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

Chan, Y M T (2008) The role of finance in competitiveness of indigenous contractors in Hong Kong, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Chen, Z (2003) An integrated analytical approach to environmental management in construction, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Dai, F (2010) Applied photogrammetry for 3D modeling, quantity surveying, and augmented reality in construction, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

De Saram, D D (2002) Measuring the quality of contractors' co-ordination activities during the construction process, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

Eskander, A K (1998) Total project management delay analysis method (TPM-DAM) with emphasis on project preplanning, Unpublished PhD Thesis, , Polytechnic University.

  • Type: Thesis
  • Keywords: project team; life cycle; project delivery; scheduling; delay analysis; construction project; owner
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/304446856
  • Abstract:
    The Delay Analysis Method (DAM) is a model for a computer program that includes a database, which lists possible delay factors that are repeatedly encountered at project preplanning. The DAM includes recommendations of various methods that can be used to avoid delays, or correct them, in order to reduce their impact on project delivery. The Total Project Management Delay Analysis Method (TPM-DAM) is considered the initial step toward a standardized project preplanning and it introduces a new dimension to the project management industry. It is a guideline that provides a method for owners and managers to plan and schedule projects and provides them with the ability to identify problem areas, or possible delays. This research developed a model diagram for Total Project Management (TPM) that is the "HOURGLASS" model. The TPM-DAM program is designed to extract scheduling and cost data from existing scheduling software and the data can also be a direct input by the users. Project preplanning is one of the most important phases in the life cycle of projects and this is true for most projects. With an adequate and organized effort during the preplanning phase, a more efficient and cost effective project should result. The type of projects that were evaluated in this research were construction projects. Public and private construction projects were compared, contrasted, and evaluated in order to determine the most effective project preplanning and development method. This research addressed the probable causes for delays in the early phases of project development and their impact on various project parameters such as schedule, cost, scope, and project team work performance, quality, and efficiency. Users should be able to develop cost and schedule control strategies based on the TPM-DAM program outcome. The research introduced a logical model that, when implemented, improves current industry planning and development processes and reduces overall project life cycle time and cost.

Fiona, T S C (2009) A critical study on performance-based fire safety design in Hong Kong with timber perforated ceilings as an example, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Fu, W K (2004) The effect of experience in construction contract bidding, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

Guo, H (2009) Rethinking construction project management using the VP-based manufacturing management model, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Hao, J L J (2002) Better use of information: A simulation model for international construction joint ventures in China, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Hong, J (2006) A study on analytic approaches to intelligent buildings assessment, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Huang, T (2009) Virtual prototyping technologies enhanced construction planning, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Jaillon, L C (2009) The evolution of the use of prefabrication techniques in Hong Kong construction industry, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Kam, C W (2000) Quality assurance of construction works in Hong Kong, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

Lam, W M (2005) A conceptual model of success for design and build projects in the public sector of Hong Kong, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Lee, L P (2012) Do construction workers accept automated monitoring? A study on the acceptance level and its antecedents, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Leung, W Y (2006) A study of the competitiveness of local contractors in Hong Kong, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Liang, Y (2006) Integrated IT systems for construction site management, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Lin, G (2009) Measuring the performance of value management studies in construction, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Liu, G W (2003) A framework for implementing value management in China's construction industry, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Liu, Y (2009) Critical factors for managing project communication among participants at the construction stage, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

Lockley, E E (1998) Forensic engineering investigation into construction failures and their documentation, Unpublished PhD Thesis, , Polytechnic University.

Lu, W (2006) A system for assessing and communicating contractors' competitiveness, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Luo, X (2011) A knowledge-based electronic meeting system for implementing value management in construction briefing, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Mohammadinia, M R (1997) Development of rational and defensible pay schedules for a performance specification using performance prediction and user and agency costs, Unpublished PhD Thesis, , Polytechnic University.

Mootanah, D P (1999) A holistic approach to the management of risk and value in project management, Unpublished PhD Thesis, School of Design and Communication Systems, Anglia Polytechnic University.

Ochoa Paniagua, J J (2011) Production planning approach for implementing sustainable building projects, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Oo, B L (2007) Modelling individual contractors' bidding decisions in different competitive environments, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Pan, Y H (2007) Application of industrialized housing system in major cities in China: A case study of Chongqing, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Tan, Y (2009) Contractor's competitiveness and competitive strategy in Hong Kong, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Tang, L (2011) Effective and efficient briefing in public private partnership projects in the construction industry, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Tse, T-c (2009) The interoperability of building information models and document models in the Hong Kong construction industry, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Wang, S Q (1995) A methodology for comparing the productivities of the ready mixed concrete industries in major cities, Unpublished PhD Thesis, Department of Civil and Structural Engineering, Hong Kong Polytechnic University.

Wong, K W J (2007) Development of selection evaluation and system intelligence analytic models for the intelligent building control systems, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Wong, M W J (2006) Forecasting manpower demand in the construction industry of Hong Kong, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

Wong, W H (2007) Developing and implementing an empirical system for scoring buildability of designs in the Hong Kong construction industry, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Xia, B (2010) The selection of design-build operational variations in the people's republic of China using Delphi method and fuzzy set theory, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Yang, C (2004) Knowledge-based understanding and interpretation of construction engineering drawings, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Yang, J (2010) A framework for stakeholder management in construction projects, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Yao, H (2009) A dynamic approach for evaluating the sustainability performance of infrastructure projects, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Ye, K (2009) Modelling competition intensity in construction market, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

Yip, R C P (2009) The cultural shift of the construction industry of Hong Kong under the influence of sustainable development, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Yuan, H (2011) A dynamic model for assessing the effectiveness of construction and demolition waste management, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

Zhang, X (2010) Competitiveness for real estate developers: a China study, Unpublished PhD Thesis, Department of Building and Real Estate, Hong Kong Polytechnic University.